ADU Regulations in Santa Monica, California
Los Angeles County · CA · Pop. 91,000
Santa Monica is more generous than state minimums on height: a detached ADU can be two stories or 24 ft tall, and ADUs do not count toward lot coverage or floor area. Side and rear setbacks are 4 ft, with a 6 ft separation from the main house. Coastal Zone parcels may need extra review, and the city runs a preapproved detached ADU plan program.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days for ministerial review
Build Cost
$200,000 – $600,000
Local Rules
What's Different in Santa Monica
- ›Detached ADUs up to 2 stories or 24 ft
- ›ADUs and JADUs exempt from parcel coverage and floor area limits
- ›6 ft minimum separation between a detached ADU and the main home
- ›Preapproved Standard ADU Plans program (detached ADUs only) with expedited review
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
Santa Monica's Coastal Zone covers most of the city; additional California Coastal Commission review may be required for new construction near the beach
Source: City of Santa Monica: ADU Program · Santa Monica Municipal Code Section 9.31.025 (Accessory Dwelling Units and Junior Accessory Dwelling Units)
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 24 ft / 2 stories (detached); ADUs within or attached to the main home follow the underlying zone height limit
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: ADUs and JADUs are exempt from parcel coverage and floor area calculations
Detached ADUs must be at least 6 ft from the main dwelling, measured between exterior walls. No setback is required for an ADU built within an existing structure or rebuilt in the same location and dimensions. Coastal Zone properties may require additional review.
Permitting
Permit Process
Department
Santa Monica Planning & Community Development Department
Review Timeline
60 days for ministerial review; Coastal Development Permit adds 30–60 days for properties in coastal zone
Permit Fees
$6,000 – $28,000
Impact Fees
Waived for ADUs 750 sq ft and under
Required Documents
- ›Building permit application
- ›Site plan with all existing and proposed structures
- ›Architectural drawings (plans, sections, elevations)
- ›Title 24 energy compliance
- ›Structural engineering (new construction)
- ›Coastal Development Permit application (if in Coastal Zone)
Santa Monica requires design review for ADUs in historic districts and the Ocean Park neighborhood
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Santa Monica operates its own electric utility (unlike most CA cities which use SCE). Check with SMa.r.t. Grid for electrical service requirements.
Financials
ADU Costs in Santa Monica
Typical Build Cost
$200,000 – $600,000
Cost per Sq Ft
$325 – $550
Monthly Rental
$2,500 – $6,000/mo
Property Value Added
Adds $300,000 – $600,000 to property value in the westside market
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★LA County PACE financing available for Santa Monica properties
Santa Monica commands some of the highest ADU rental rates in Southern California due to walkability, transit access, and coastal location. Premium over inland LA: 25–40%.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Santa Monica
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Santa Monica
Santa Monica can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Santa Monica: ADU Program (Santa Monica Municipal Code Section 9.31.025 (Accessory Dwelling Units and Junior Accessory Dwelling Units))
- City of Santa Monica: ADU and JADU Guide, Parcels with a Single-Unit Dwelling
- City of Santa Monica: ADU Guide, Parcels with a Multiple-Unit Dwelling
- City of Santa Monica: Preapproved ADU Program
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Los Angeles County
Santa Monica Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days for ministerial review
- Build cost$200,000 – $600,000
- Rental income$2,500 – $6,000/mo
- Owner occupancyNot required
Official Source
City of Santa Monica: ADU ProgramSanta Monica Municipal Code Section 9.31.025 (Accessory Dwelling Units and Junior Accessory Dwelling Units)
Last verified: September 30, 2026
Stay Updated
ADU rules change often.
Get notified when Santa Monica's regulations update, plus guides on permitting and financing.