ADU Regulations in Santa Clarita, California
Los Angeles County · CA · Pop. 230,000
Santa Clarita limits ADUs to 850 sq ft for a studio or one-bedroom and 1,000 sq ft for two bedrooms, with 4 ft side and rear setbacks for new detached units. Much of the city lies in fire hazard severity zones and hillside areas, so fire-rated materials and soils reports are common added costs. The Planning Division updated its ADU handout in March 2026.
Max ADU Size
1,000
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$150,000 – $320,000
Local Rules
What's Different in Santa Clarita
- ›ADU size: 850 sq ft (studio or 1 bedroom), 1,000 sq ft (2 bedrooms)
- ›Fire-rated construction common in fire hazard severity zones
- ›Hillside lots may need soils or geology reports
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs allowed on all residential lots per state law; hillside lots may have additional slope restrictions
Source: City of Santa Clarita Planning Division: Frequently Asked Questions · Santa Clarita Unified Development Code Section 17.57.040
Dimensions
Size & Setback Requirements
Detached
1,000
sq ft max
JADU
500
sq ft max
Attached
850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2 bedrooms)
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft (detached); 18 ft within half a mile of a major transit stop, plus 2 ft for a 2:12 roof pitch
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per zone; hillside overlay may restrict total coverage
Santa Clarita has fire hazard severity zones; fire-rated construction materials may be required
Permitting
Permit Process
Department
Santa Clarita Community Development
Review Timeline
60 days
Permit Fees
$7,000 – $16,000
Impact Fees
School fees apply for ADUs over 500 sq ft; impact fees waived under 750 sq ft
Required Documents
- ›Site plan
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance
- ›Soils/geological report if on hillside
- ›Structural drawings
Fire hazard zone construction adds cost but is well-understood by local contractors
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Santa Clarita
Typical Build Cost
$150,000 – $320,000
Cost per Sq Ft
$210 – $290
Monthly Rental
$1,700 – $2,800/mo
Property Value Added
Adds $150,000 – $280,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Fire zone construction requirements add 10–20% to build cost vs standard lots
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Santa Clarita
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Santa Clarita
Santa Clarita can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Santa Clarita Planning Division: Frequently Asked Questions (Santa Clarita Unified Development Code Section 17.57.040)
- City of Santa Clarita Planning Division: ADU Handout (March 2026)
- City of Santa Clarita Building & Safety: ADU Plan Requirements
- HCD ADU ordinance review letter: Santa Clarita (Mar. 2023)
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Los Angeles County
Santa Clarita Quick Facts
- Max size1,000 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$150,000 – $320,000
- Rental income$1,700 – $2,800/mo
- Owner occupancyNot required
Official Source
City of Santa Clarita Planning Division: Frequently Asked QuestionsSanta Clarita Unified Development Code Section 17.57.040
Last verified: October 4, 2026
Stay Updated
ADU rules change often.
Get notified when Santa Clarita's regulations update, plus guides on permitting and financing.