ADU Regulations in Long Beach, California
Los Angeles County · CA · Pop. 466,000
Long Beach has no local ADU ordinance of its own, so every ADU and JADU is reviewed directly against state ADU law. Coastal Zone lots need an administrative Local Coastal Development Permit before the building permit, and historic district lots need a Certificate of Appropriateness. The city also runs a pre-approved ADU plan program to shorten plan check.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
30–60 days for ministerial review
Build Cost
$150,000 – $420,000
Local Rules
What's Different in Long Beach
- ›No adopted local ADU ordinance: state ADU law standards apply directly
- ›Coastal Zone: administrative (no-hearing) Local Coastal Development Permit required before building permit submittal
- ›Historic districts: Certificate of Appropriateness required
- ›Detached ADUs may reach 18 ft within 1/2 mile walking distance of major transit or on lots with a multi-story multifamily building
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
Long Beach has not adopted a local ADU ordinance; ADU and JADU projects are reviewed strictly under state ADU law
Source: City of Long Beach: ADU Program · Long Beach Municipal Code Title 21 (Zoning)
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home or 800 sq ft, whichever is more; max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft detached; 18 ft within 1/2 mile walking distance of major transit or on a lot with a multi-story multifamily dwelling; attached per state law
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Subject to base zone lot coverage limits
ADUs within converted garages may maintain existing zero setbacks. Coastal zone properties require additional review.
Permitting
Permit Process
Department
City of Long Beach Community Development: Building & Safety
Review Timeline
30–60 days for ministerial review
Permit Fees
$4,500 – $18,000
Impact Fees
Waived for ADUs 750 sq ft and under
Required Documents
- ›Permit application
- ›Site plan with setback dimensions
- ›Architectural drawings (floor plans, elevations)
- ›Title 24 energy compliance documentation
- ›Structural plans (for new construction)
- ›Grading plan (if applicable)
Properties in the Coastal Zone must obtain an administrative (no-hearing) Local Coastal Development Permit before submitting for a building permit. Historic district properties need a Certificate of Appropriateness.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
See below
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Southern California Edison serves most of Long Beach for electrical; panel upgrade often required for new ADU
Financials
ADU Costs in Long Beach
Typical Build Cost
$150,000 – $420,000
Cost per Sq Ft
$250 – $380
Monthly Rental
$1,700 – $3,800/mo
Property Value Added
Adds $180,000 – $350,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★LA County programs may apply to unincorporated areas near Long Beach
Coastal and near-beach neighborhoods command premium rents; areas east of the 405 typically have lower build costs
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Long Beach
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Long Beach
Long Beach can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Long Beach: ADU Program (Long Beach Municipal Code Title 21 (Zoning))
- IB-PZ-001 Planning Accessory Dwelling Unit Bulletin
- Summary of Accessory Dwelling Unit Zoning Regulations
- Long Beach Pre-Approved ADU Program
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Los Angeles County
Long Beach Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline30–60 days for ministerial review
- Build cost$150,000 – $420,000
- Rental income$1,700 – $3,800/mo
- Owner occupancyNot required
Official Source
City of Long Beach: ADU ProgramLong Beach Municipal Code Title 21 (Zoning)
Last verified: September 30, 2026