ADU Regulations in Santa Ana, California
Orange County · CA · Pop. 310,000
Santa Ana caps detached ADUs at 1,000 sq ft but allows them up to 20 ft or two stories, which helps on the city's many small lots. The city's Pre-Approved ADU Plans Program offers detached designs in Ranch, Spanish, Traditional and Contemporary styles. Garage conversions remain the most common project.
Max ADU Size
1,000
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$120,000 – $260,000
Local Rules
What's Different in Santa Ana
- ›Detached ADUs up to 1,000 sq ft
- ›Detached height up to 20 ft or two stories
- ›Pre-Approved ADU Plans Program for detached units
- ›JADUs up to 500 sq ft within the home or attached garage
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs allowed on any residential lot; ministerial approval per state law
Source: City of Santa Ana: Accessory Dwelling Units · Santa Ana Municipal Code Section 41-194
Dimensions
Size & Setback Requirements
Detached
1,000
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 20 ft or two stories (detached)
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Many Santa Ana lots are smaller; garage conversions are often the most practical option
Permitting
Permit Process
Department
Santa Ana Planning & Building Agency
Review Timeline
60 days
Permit Fees
$5,500 – $12,000
Impact Fees
No impact fees for ADUs under 750 sq ft
Required Documents
- ›Site plan
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance
- ›Structural drawings (new construction)
Santa Ana's high density makes garage conversions especially popular
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Santa Ana
Typical Build Cost
$120,000 – $260,000
Cost per Sq Ft
$190 – $260
Monthly Rental
$1,400 – $2,400/mo
Property Value Added
Adds $120,000 – $240,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★City of Santa Ana may have local housing programs; check with PBA
Garage conversions can be completed for $60,000–$110,000 in Santa Ana
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Santa Ana
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Santa Ana
Santa Ana can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Santa Ana: Accessory Dwelling Units (Santa Ana Municipal Code Section 41-194)
- City of Santa Ana: ADU/JADU Development Standards
- City of Santa Ana: Pre-Approved ADU Plans
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Orange County
Santa Ana Quick Facts
- Max size1,000 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$120,000 – $260,000
- Rental income$1,400 – $2,400/mo
- Owner occupancyNot required
Official Source
City of Santa Ana: Accessory Dwelling UnitsSanta Ana Municipal Code Section 41-194
Last verified: September 30, 2026
Stay Updated
ADU rules change often.
Get notified when Santa Ana's regulations update, plus guides on permitting and financing.