Verified October 4, 2026

ADU Regulations in Garden Grove, California

Orange County · CA · Pop. 175,000

Garden Grove runs ADU Go, a set of four city-owned pre-approved ADU plans that homeowners can use for free. Most lots are compact (about 5,000 to 7,000 sq ft), so garage conversions and careful rear-yard placement are common. Short-term rentals are not allowed in the primary home, ADU or JADU.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days for ministerial review

Build Cost

$160,000 – $330,000

Local Rules

What's Different in Garden Grove

  • ›ADU Go offers four free city-owned plans (about 447, 630, 750 and 1,000 sq ft)
  • ›Short-term rental of the primary home, ADU or JADU is prohibited
  • ›Compact 5,000 to 7,000 sq ft lots make garage conversions a common choice
  • ›Older city handouts may not match the current Chapter 9.54; confirm with Planning

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

Garden Grove is a dense suburban city in north Orange County. Garage conversions are especially prevalent given the city's older single-family housing stock with attached and detached garages. ADUs are permitted by right in all residential zones.

Source: City of Garden Grove: Accessory Dwelling Units · Garden Grove Municipal Code Title 9, Chapter 9.54

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

850 sq ft (studio or one bedroom) or 1,200 sq ft (two or more bedrooms)

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft detached (18 ft on a lot with a multistory multifamily building); attached up to 25 ft or the primary home's height limit, whichever is lower

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; state law exempts ADUs from lot coverage limits in many cases

Many Garden Grove lots are compact (5,000–7,000 sq ft), so ADU placement requires careful site planning to meet setbacks. Garage conversions on existing footprints can avoid setback issues entirely.

Permitting

Permit Process

Department

Community Development Department

Review Timeline

60 days for ministerial review

Permit Fees

$8,000 – $17,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; applicable fees assessed proportionally above that size

Required Documents

  • ›Site plan (to scale)
  • ›Floor plans (existing and proposed)
  • ›Elevation drawings
  • ›Title 24 energy compliance report
  • ›Structural drawings (new construction)
  • ›Soils/geotechnical report (if required by building official)

Orange County permitting costs are generally higher than Inland Empire but lower than coastal cities. Garden Grove's Community Development department provides an ADU handout with local checklist. Pre-application meetings are encouraged for new detached construction.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connect to existing sewer lateral; Garden Grove sewer system covers most of the city
Fire Sprinklers: Not required unless primary dwelling has fire sprinklers
Parking: No additional parking required

Golden State Water Company and Garden Grove serve different parts of the city for water. Verify your utility provider. Electrical panel upgrades are common when converting garages, particularly in homes built prior to 1990.

Financials

ADU Costs in Garden Grove

Typical Build Cost

$160,000 – $330,000

Cost per Sq Ft

$225 – $300

Monthly Rental

$1,700 – $2,700/mo/mo

Property Value Added

Adds $160,000 – $290,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★Orange County Housing Finance Trust programs may be available

Garden Grove's location near Disneyland, the 22 Freeway, and Little Saigon supports consistent rental demand. Garage conversions typically run $70,000–$130,000 and represent the most cost-effective ADU option for the city's older housing stock.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Garden Grove

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Garden Grove

Garden Grove can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: October 4, 2026. Verify with Community Development Department

Garden Grove Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days for ministerial review
  • Build cost$160,000 – $330,000
  • Rental income$1,700 – $2,700/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Garden Grove ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Garden Grove's regulations update, plus guides on permitting and financing.