Fresno's ADU Program offers five pre-approved plans, from a 340 sq ft studio to a 1,015 sq ft three-bedroom unit, each with three exterior styles and solar plans included. Using a standard plan can shorten plan check considerably compared with a custom design. Detached and attached ADUs are capped at 1,200 sq ft and 16 ft in height.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days for ministerial approval

Build Cost

$90,000 – $200,000

Local Rules

What's Different in Fresno

  • ›Five pre-approved plans from 340 to 1,015 sq ft, each with three elevation styles
  • ›Pre-approved plan sets include solar plans
  • ›Standard-plan permits can be issued in about 7 to 10 business days when the site plan is complete
  • ›ADU program contact: adu@fresno.gov, 559-621-8077

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

ADUs allowed on any parcel with an existing or proposed single-family or multifamily dwelling

Source: City of Fresno: Accessory Dwelling Units · Fresno Municipal Code Section 15-1306

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling setback

side

4 ft

rear

4 ft

Max height: 16 ft

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone

Existing nonconforming structures may be converted regardless of setbacks

Permitting

Permit Process

Department

Fresno Development and Resource Management

Review Timeline

60 days for ministerial approval

Permit Fees

$4,000 – $10,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft

Required Documents

  • ›Site plan drawn to scale
  • ›Floor plans (existing and proposed)
  • ›Elevation drawings
  • ›Title 24 energy compliance report
  • ›Structural calculations (new construction)

Fresno offers a pre-approved ADU plan program to expedite permits

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connect to existing sewer lateral where possible
Fire Sprinklers: Not required unless primary dwelling requires them
Parking: No additional parking required for ADUs near transit or when garage is converted

Electrical panel upgrade may be required for older homes

Financials

ADU Costs in Fresno

Typical Build Cost

$90,000 – $200,000

Cost per Sq Ft

$150 – $220

Monthly Rental

$900 – $1,600/mo

Property Value Added

Adds $80,000 – $160,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)

Central Valley labor and material costs are among the lowest in the state

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Fresno

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Fresno

Fresno can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: September 30, 2026. Verify with Fresno Development and Resource Management

Explore More

Nearby Cities in Fresno County

Fresno Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days for ministerial approval
  • Build cost$90,000 – $200,000
  • Rental income$900 – $1,600/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Fresno ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Fresno's regulations update, plus guides on permitting and financing.