ADU Regulations in Clovis, California
Fresno County · CA · Pop. 120,000
Clovis started one of California's first free ADU plan programs, the Cottage Home Program, originally aimed at alley lots in Old Town and now open citywide. The city also runs a pre-approved ADU plan program under AB 1332. Large suburban lots and three-car garages make both detached units and garage conversions common.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$120,000 – $250,000
Local Rules
What's Different in Clovis
- ›Cottage Home Program: free pre-approved plans, first targeted at Old Town alley lots
- ›Pre-approved ADU plan program for designer-submitted plans
- ›Check HOA CC&Rs in newer subdivisions before designing
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs permitted by right in all residential zones. Clovis is an affluent Fresno suburb with strong multigenerational housing demand. Owner-occupancy not required per state law.
Source: City of Clovis: Accessory Dwelling Units · Clovis Municipal Code Chapter 9.40 (Standards for Specific Land Uses)
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling per underlying zone
side
4 ft
rear
4 ft
Max height: 16 ft detached (18 ft within 1/2 mile walking distance of a major transit stop or high-quality transit corridor); 25 ft attached
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone; Clovis lots tend to be larger, providing generous ADU siting options
Clovis's larger suburban lot sizes often provide ample room for detached ADUs. Garage conversions are common due to the prevalence of two- and three-car attached garages in newer subdivisions.
Permitting
Permit Process
Department
City of Clovis: Planning and Development Services Department
Review Timeline
60 days
Permit Fees
$4,500 – $9,500
Impact Fees
Impact fees waived for ADUs under 750 sq ft; prorated for larger units
Required Documents
- ›Site plan with property dimensions and setbacks
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance report
- ›Structural drawings
- ›Landscape plan (if applicable per HOA requirements)
Clovis has among the lower permit fees in California, reflecting the lower cost of government services in the Central Valley. HOA restrictions may apply in newer subdivisions; verify CC&Rs before submitting plans.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Clovis
Typical Build Cost
$120,000 – $250,000
Cost per Sq Ft
$170 – $230
Monthly Rental
$1,100 – $1,800/mo/mo
Property Value Added
Adds $90,000 – $180,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Clovis is an affluent Fresno suburb with top-rated schools and strong multigenerational family demand for ADUs. Fresno State University affiliates also drive rental demand. Central Valley construction costs are among the most affordable in California.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Clovis
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Clovis
Clovis can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Clovis: Accessory Dwelling Units (Clovis Municipal Code Chapter 9.40 (Standards for Specific Land Uses))
- City of Clovis: ADUs Preapproved Plans
- Clovis Municipal Code Chapter 9.40
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Clovis Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$120,000 – $250,000
- Rental income$1,100 – $1,800/mo/mo
- Owner occupancyNot required
Official Source
City of Clovis: Accessory Dwelling UnitsClovis Municipal Code Chapter 9.40 (Standards for Specific Land Uses)
Last verified: October 4, 2026