ADU Regulations in Daly City, California
San Mateo County · CA · Pop. 105,000
Daly City has a pre-reviewed detached ADU plan program, but you must hire the designer who drew the plan and cannot modify it, and site-specific engineering is still required. Many parcels are on hillsides and need geotechnical review. On tight lots, garage conversions and attached units are often the only practical option.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$210,000 – $420,000
Local Rules
What's Different in Daly City
- ›Pre-reviewed ADU plans must be built as submitted, through the original designer
- ›Hillside parcels often need geotechnical review
- ›Planner of the Day available at 650-991-8033
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
State law preempts local owner-occupancy requirements. Daly City sits directly adjacent to San Francisco and hosts the BART Daly City terminal, making it the primary gateway for SF commuters seeking more affordable housing. SF spillover demand is the defining force in the local ADU rental market.
Source: City of Daly City: Accessory Dwelling Units · Daly City Municipal Code Title 17 (Zoning)
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 18 ft detached (up to 20 ft to match the main home's roof pitch); attached up to primary structure height
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone; hillside parcels may have additional slope coverage restrictions
Daly City has significant hillside terrain; many parcels require geotechnical review before ADU construction. The city's dense ticky-tacky neighborhoods (celebrated in the famous song) have tight lots; garage conversions and attached ADUs are often the most viable option.
Permitting
Permit Process
Department
City of Daly City Development Services Department: Planning Division
Review Timeline
60 days
Permit Fees
$10,000 – $20,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold
Required Documents
- ›Site plan (to scale)
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance (CalGreen)
- ›Structural drawings
- ›Geotechnical/soils report (required for most hillside lots)
- ›Grading and drainage plan
SF Peninsula build costs and engineering requirements for hillside lots place Daly City permit costs at the higher end of the range. San Mateo County school fees may apply. BART proximity significantly enhances ADU rental value; factor into ROI calculations.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Daly City
Typical Build Cost
$210,000 – $420,000
Cost per Sq Ft
$285 – $365
Monthly Rental
$2,100 – $3,400/mo/mo
Property Value Added
Adds $300,000 – $550,000 to property value in SF Peninsula market
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★San Mateo County Housing Department programs
- ★Bay Area Housing Finance Authority programs
Highest build costs and highest rental yields in this dataset, reflecting SF Peninsula market dynamics. BART Daly City station provides direct, car-free access to downtown SF in under 30 minutes; ADUs within walking distance of the station command a rent premium of $300–$500/mo.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Daly City
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Daly City
Daly City can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Daly City: Accessory Dwelling Units (Daly City Municipal Code Title 17 (Zoning))
- City of Daly City: Preapproved Accessory Dwelling Units (ADUs)
- City of Daly City: ADU new construction and legalization handout
- City of Daly City: Accessory Dwelling Unit Guide
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Daly City Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$210,000 – $420,000
- Rental income$2,100 – $3,400/mo/mo
- Owner occupancyNot required
Official Source
City of Daly City: Accessory Dwelling UnitsDaly City Municipal Code Title 17 (Zoning)
Last verified: October 4, 2026