ADU Regulations in Santa Maria, California
Santa Barbara County · CA · Pop. 105,000
Santa Maria's ADU rules live in Municipal Code Chapter 12-56, last amended by Ordinance 2024-04. The city allows detached ADUs up to 1,200 sq ft and 18 ft tall on single-family lots, a bit more generous than the 16 ft state floor. Pre-approved plans come from Santa Barbara County rather than the city, and homes near active farmland may see extra review.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$135,000 – $275,000
Local Rules
What's Different in Santa Maria
- ›Detached ADUs up to 1,200 sq ft and 18 ft tall, or 20 ft when matching the main house roof pitch
- ›Attached ADUs may reach 50% of the main home or 850 sq ft (1,000 sq ft with 2+ bedrooms), whichever is greater
- ›Santa Barbara County has released free pre-approved ADU plans for the region
- ›Lots next to active agricultural land may get additional review
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
State law preempts local owner-occupancy requirements. Up to three units per single-family lot under state law (conversion ADU, JADU, and detached ADU). Multifamily lots may allow additional detached ADUs per state law.
Source: City of Santa Maria: Accessory Dwelling Units · Santa Maria Municipal Code Chapter 12-56 (Accessory Dwelling Units), as amended by Ordinance No. 2024-04
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
Greater of 50% of primary home or 850 sq ft (1,000 sq ft with more than one bedroom)
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 18 ft (detached, single-family lot); up to 20 ft to match the primary home's roof pitch; attached ADUs follow primary dwelling height standards
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Existing non-conforming structures converted to ADUs may be entitled to 4 ft side/rear setbacks per state law. No setback required for ADUs built within the footprint of a legally established structure.
Permitting
Permit Process
Department
City of Santa Maria Community Development Department: Planning Division
Review Timeline
60 days
Permit Fees
$5,000 – $10,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft per state law
Required Documents
- ›Site plan
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance
- ›Structural drawings
- ›Grading and drainage plan (if applicable)
Santa Maria follows streamlined ministerial ADU approval per AB 2221 and SB 897. Pre-application consultations are available through the Planning Division. Agricultural zone adjacency may trigger additional review for properties near active farmland.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Santa Maria
Typical Build Cost
$135,000 – $275,000
Cost per Sq Ft
$190 – $255
Monthly Rental
$1,200 – $2,000/mo/mo
Property Value Added
Adds $140,000 – $260,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★Santa Barbara County Housing Trust Fund loans (income-qualified)
Central Coast construction costs are moderate compared to Bay Area. Vandenberg Space Force Base military tenants provide stable, consistent rental demand. Agricultural economy and UC Santa Barbara proximity generate additional renter pool.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Santa Maria
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Santa Maria
Santa Maria can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Santa Maria: Accessory Dwelling Units (Santa Maria Municipal Code Chapter 12-56 (Accessory Dwelling Units), as amended by Ordinance No. 2024-04)
- Santa Maria Municipal Code Chapter 12-56: Accessory Dwelling Units
- Ordinance No. 2024-04 (ADU amendments)
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Santa Maria Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$135,000 – $275,000
- Rental income$1,200 – $2,000/mo/mo
- Owner occupancyNot required
Official Source
City of Santa Maria: Accessory Dwelling UnitsSanta Maria Municipal Code Chapter 12-56 (Accessory Dwelling Units), as amended by Ordinance No. 2024-04
Last verified: September 30, 2026
Stay Updated
ADU rules change often.
Get notified when Santa Maria's regulations update, plus guides on permitting and financing.