Roseville caps ADUs at 850 sq ft for a studio or one-bedroom and 1,000 sq ft for more than one bedroom, with a 16 ft height limit for detached units and up to 25 ft when attached. The city publishes preapproved ADU plans under AB 1332 and has a separate ADU fee policy. Many newer neighborhoods have HOAs, but state law bars them from prohibiting ADUs.

Max ADU Size

1,000

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$155,000 – $310,000

Local Rules

What's Different in Roseville

  • ›ADU size: 850 sq ft (studio or 1 bedroom), 1,000 sq ft (2+ bedrooms)
  • ›Detached height 16 ft; attached up to 25 ft
  • ›Preapproved ADU plans program (AB 1332)
  • ›Each ADU needs a full kitchen and full bathroom

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

ADUs are permitted by right in all residential zones. Roseville uses its own zone designations (RLD = Low Density Residential, RMD = Medium Density, RHD = High Density) but mirrors state law in all material respects. The city's newer master-planned neighborhoods often have HOAs; state law prohibits HOAs from banning ADUs but they may regulate aesthetics.

Source: City of Roseville: Accessory Dwelling Units (Single-Family) Handout · Roseville Municipal Code Chapter 19.60 (Accessory Dwelling Units)

Dimensions

Size & Setback Requirements

Detached

1,000

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft (detached); up to 25 ft if attached or above garage

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone; RLD typically 40–45%

Roseville's newer subdivisions often have larger rear yards than infill Sacramento neighborhoods, giving homeowners ample room for a full 1,200 sq ft detached ADU. Lots in older downtown-adjacent neighborhoods are smaller; JADU or attached conversions may be more practical there.

Permitting

Permit Process

Department

Community Development: Planning Division

Review Timeline

60 days

Permit Fees

$6,000 – $12,000

Impact Fees

Impact fees waived for ADUs under 750 sq ft; pro-rated for larger units; school impact fees may apply

Required Documents

  • ›Site plan with property lines, setbacks, and existing structures
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance
  • ›Structural drawings
  • ›Utility connection plan

Roseville has one of the more efficient permit processing workflows in the Sacramento region and offers an online permit portal. ADU-specific handouts and a pre-application checklist are available on the Planning Division website. School fees (Roseville City School District and Roseville Joint Union High School District) are assessed separately.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connection to Roseville Public Utilities sewer system; separate lateral not required if existing service is adequate
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Roseville

Typical Build Cost

$155,000 – $310,000

Cost per Sq Ft

$215 – $280

Monthly Rental

$1,500 – $2,400/mo/mo

Property Value Added

Adds $130,000 – $240,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
  • ★Placer County Housing Trust Fund resources

As one of California's fastest-growing cities, Roseville sees strong ADU demand from tech workers commuting to Sacramento and remote workers priced out of the Bay Area. Construction costs are moderate compared to coastal markets, making ADU ROI particularly attractive here.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Roseville

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Roseville

Roseville can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: September 30, 2026. Verify with Community Development: Planning Division

Roseville Quick Facts

  • Max size1,000 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$155,000 – $310,000
  • Rental income$1,500 – $2,400/mo/mo
  • Owner occupancyNot required

Get Free Quotes

Licensed Roseville ADU contractors, no obligation.

Get My Free Quotes

Stay Updated

ADU rules change often.

Get notified when Roseville's regulations update, plus guides on permitting and financing.