ADU Regulations in Redding, California
Shasta County · CA · Pop. 92,000
Redding caps new ADUs at 1,000 sq ft under Section 18.43.140 of its zoning code, below the 1,200 sq ft many California cities allow. The city runs a Pre-Approved ADU Program with ready-to-permit plans, and short-term rentals under 30 days are not allowed. Many lots sit near wildfire-prone terrain, so fire-hardened construction can add cost.
Max ADU Size
1,000
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$120,000 – $245,000
Local Rules
What's Different in Redding
- ›ADUs capped at 1,000 sq ft
- ›Pre-Approved ADU Program with permit-ready plans
- ›Detached ADU height 16 ft
- ›Rentals must be longer than 30 days
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
Redding is the regional hub of Northern California's Shasta County. ADU regulations follow California state law. The city has actively streamlined ADU permitting to address the region's housing shortage.
Source: City of Redding: Accessory Dwelling Units · Redding Municipal Code Title 18 (Zoning), Section 18.43.140
Dimensions
Size & Setback Requirements
Detached
1,000
sq ft max
JADU
500
sq ft max
Attached
Up to 1,000 sq ft (an 800 sq ft unit is always allowed under state law)
Setbacks
front
Same as primary dwelling per underlying zone
side
4 ft
rear
4 ft
Max height: 16 ft
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Redding's larger residential lots in many RS zones provide generous space for detached ADUs. Wildfire-adjacent properties (Tier 2 or 3 High Fire Hazard Severity Zones) may require additional defensible space and ignition-resistant construction.
Permitting
Permit Process
Department
City of Redding Development Services Department: Planning Division
Review Timeline
60 days
Permit Fees
$4,500 – $9,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft; proportional fees apply above that threshold
Required Documents
- ›Site plan (to scale, showing lot dimensions, all structures, setbacks)
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance (residential)
- ›Structural drawings
- ›Wildfire hazard assessment (if in HFHSZ)
Redding's permitting fees are among the more affordable in California, reflecting the city's commitment to housing production. Properties in High Fire Hazard Severity Zones should budget for additional fire-hardening construction costs.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
See below
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Redding
Typical Build Cost
$120,000 – $245,000
Cost per Sq Ft
$170 – $230
Monthly Rental
$1,100 – $1,800/mo/mo
Property Value Added
Adds $115,000 – $240,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Redding offers relatively low construction costs compared to coastal California. The regional medical center (Dignity Health; Mercy Medical Center) and government employment provide stable rental demand. Northern California's lower land costs mean strong yield potential for ADU investors.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Redding
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Redding
Redding can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Redding: Accessory Dwelling Units (Redding Municipal Code Title 18 (Zoning), Section 18.43.140)
- Redding Zoning Ordinance Section 18.43.140: Accessory Dwelling Units
- City of Redding ADU Information Packet
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Redding Quick Facts
- Max size1,000 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$120,000 – $245,000
- Rental income$1,100 – $1,800/mo/mo
- Owner occupancyNot required
Official Source
City of Redding: Accessory Dwelling UnitsRedding Municipal Code Title 18 (Zoning), Section 18.43.140
Last verified: September 30, 2026