ADU Regulations in Palm Springs, California
Riverside County · CA · Pop. 45,000
Palm Springs has no pre-approved ADU plan program, so homeowners need a custom or vendor design. Short-term vacation rental of an ADU needs a separate city permit subject to caps, while long-term rentals of 30 days or more are not restricted. Historic and architectural overlay areas with midcentury homes may require design review.
Max ADU Size
1,000
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$155,000 – $315,000
Local Rules
What's Different in Palm Springs
- ›No city pre-approved ADU plans
- ›Short-term rental of an ADU requires a separate STR permit, subject to caps
- ›Historic or architectural overlay areas may require design review
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
Palm Springs has active short-term rental (STR) regulations that significantly affect ADU use. STR permits for ADUs in residential zones require separate licensing and are subject to city STR caps and neighborhood permit limits. Homeowners intending to use an ADU for vacation rental must obtain an STR permit before operating. Long-term ADU rentals (30+ days) serve the hospitality, healthcare, and resort services workforce and are unrestricted.
Source: City of Palm Springs: Planning Services · Palm Springs Zoning Code Section 93.23.14
Dimensions
Size & Setback Requirements
Detached
1,000
sq ft max
JADU
500
sq ft max
Attached
850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms)
Setbacks
front
Same as primary dwelling
side
4 ft
rear
4 ft
Max height: 16 ft
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone (R-1-A, R-1-B, R-1-C vary)
Palm Springs' R-1-A, R-1-B, and R-1-C zones have varying minimum lot sizes and base development standards. The desert climate and many midcentury modern homes may impose historic or architectural overlay requirements in designated preservation areas. Pool equipment, HVAC, and mechanical setbacks should be coordinated with ADU siting in smaller lots.
Permitting
Permit Process
Department
Planning Services
Review Timeline
60 days
Permit Fees
$6,000 – $12,000
Impact Fees
Impact fees waived under 750 sq ft
Required Documents
- ›Site plan
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance
- ›Structural drawings
- ›STR permit application (if vacation rental use intended)
Palm Springs permitting is handled by Planning Services. Applicants intending to use the ADU as a short-term vacation rental must apply for an STR permit separately; STR permits are subject to city caps and may not be available in all neighborhoods. STR regulations are actively enforced. Historic district or architectural overlay areas may require design review approval.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Palm Springs
Typical Build Cost
$155,000 – $315,000
Cost per Sq Ft
$215 – $280
Monthly Rental
$1,500 – $2,500/mo (long-term)/mo
Property Value Added
Adds $165,000 – $310,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
Palm Springs ADU rental income depends heavily on intended use. Long-term rentals (30+ days) serve the resort city's large hospitality and services workforce at $1,500–$2,500/mo. Short-term vacation rentals require a separate STR permit and can generate substantially higher nightly revenue but are subject to city caps and seasonal demand swings. Desert construction costs include premium HVAC and insulation requirements.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Palm Springs
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Palm Springs
Palm Springs can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Palm Springs: Planning Services (Palm Springs Zoning Code Section 93.23.14)
- City of Palm Springs: Apply for an Application
- Palm Springs Zoning Code 93.23.14: Accessory Dwelling Units
- HCD: Palm Springs ADU Ordinance Technical Assistance Letter (Oct 2025)
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Riverside County
Palm Springs Quick Facts
- Max size1,000 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$155,000 – $315,000
- Rental income$1,500 – $2,500/mo (long-term)/mo
- Owner occupancyNot required
Official Source
City of Palm Springs: Planning ServicesPalm Springs Zoning Code Section 93.23.14
Last verified: October 4, 2026
Stay Updated
ADU rules change often.
Get notified when Palm Springs's regulations update, plus guides on permitting and financing.