ADU Regulations in Hemet, California

Riverside County · CA · Pop. 85,000

Hemet's Building & Safety Division publishes an ADU Plan Check Guide covering addressing and submittal details, while Planning answers questions on setbacks, height and unit size. Large inland lots, including RA (Residential Agriculture) parcels, leave plenty of room for detached units. Permit fees are low compared with coastal Southern California.

Max ADU Size

1,200

sq ft detached

Rear Setback

4 ft

Permit Timeline

60 days

Build Cost

$110,000 – $225,000

Local Rules

What's Different in Hemet

  • ›ADU Plan Check Guide is posted on the city's Standard Plans page
  • ›ADUs under 500 sq ft are exempt from soils report requirements
  • ›ADUs must be labeled with separate square footage on plan sets and get a separate address
  • ›RA-zoned lots offer room for larger detached ADUs

Zoning

Allowed ADU Types

✓Detached ADU
✓Attached ADU
✓JADU (Junior ADU)
✓Garage Conversion
Units per single-family lot: up to 3 (ADU + JADU + detached ADU)✓ No owner-occupancy required

State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.

ADUs are permitted in all residential zones consistent with California state law. Hemet's RA (Residential Agriculture) zone allows ADUs on larger rural-residential lots. The city is one of the most affordable ADU markets in Southern California, making it attractive for investors and working-class families.

Source: City of Hemet: Planning Department · Hemet Municipal Code Chapter 19

Dimensions

Size & Setback Requirements

Detached

1,200

sq ft max

JADU

500

sq ft max

Attached

50% of primary home, max 1,200 sq ft

Setbacks

front

Same as primary dwelling

side

4 ft

rear

4 ft

Max height: 16 ft

State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.

Lot coverage: Per underlying zone

Hemet's larger average lot sizes in inland Riverside County provide ample rear-yard space for detached ADUs. RA-zoned lots may accommodate larger ADU footprints within state law maximums. Garage conversions are a popular low-cost option in this market.

Permitting

Permit Process

Department

Planning Department

Review Timeline

60 days

Permit Fees

$4,000 – $8,000

Impact Fees

Impact fees waived under 750 sq ft

Required Documents

  • ›Site plan
  • ›Floor plans
  • ›Elevations
  • ›Title 24 energy compliance
  • ›Structural drawings

Hemet offers some of the lowest ADU permit fees in Southern California, reflecting the city's commitment to housing production and its lower infrastructure cost base. The permitting process is straightforward and staff is generally responsive to ADU applications.

Infrastructure

Utilities & Requirements

Solar

Required

Parking

Usually none

Separate Meter

Optional

Fire Sprinklers

Only if main home has them

Sewer: Connection to city sewer required; septic systems permitted in RA zone where sewer is unavailable
Fire Sprinklers: Not required unless primary structure requires them
Parking: No additional parking required

Financials

ADU Costs in Hemet

Typical Build Cost

$110,000 – $225,000

Cost per Sq Ft

$155 – $210

Monthly Rental

$1,000 – $1,600/mo/mo

Property Value Added

Adds $100,000 – $200,000 to property value

Grants & Programs to Check

  • ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)

Hemet is among the most affordable ADU construction markets in Southern California. Lower land values and construction costs make ADUs financially accessible for a broader range of homeowners. Rental demand is driven by working-class households, healthcare workers, and retirees in the inland valley.

Use the free ADU Cost Calculator →

Free Service

Get Contractor Quotes in Hemet

Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.

Get Free Quotes

State Law

California Rules That Apply in Hemet

Hemet can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.

Units per lot
Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
Size
Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
Height
Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
Setbacks
Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
Permit timeline
The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
Impact fees
No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
Owner-occupancy
Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
Parking
No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
Fire sprinklers
Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
Pre-approved plans
Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
Selling an ADU
Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
Unpermitted ADUs
ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Disclaimer: Information is compiled from publicly available municipal codes for general informational purposes only. It does not constitute legal, zoning, or construction advice. Regulations change frequently. Always verify with your local planning department. Last verified: March 14, 2026. Verify with Planning Department

Hemet Quick Facts

  • Max size1,200 sq ft
  • Rear setback4 ft
  • Permit timeline60 days
  • Build cost$110,000 – $225,000
  • Rental income$1,000 – $1,600/mo/mo
  • Owner occupancyNot required

Get Free Quotes