ADU Regulations in Antioch, California
Contra Costa County · CA · Pop. 115,000
Antioch offers city pre-approved ADU plans: applications that use them are decided within 30 days and pay reduced plan check fees. Standard rules otherwise follow state law, with 16 ft detached and 25 ft attached height limits and 4 ft side and rear setbacks. Larger lots in newer east Antioch subdivisions leave the most room for detached units.
Max ADU Size
1,200
sq ft detached
Rear Setback
4 ft
Permit Timeline
60 days
Build Cost
$150,000 – $305,000
Local Rules
What's Different in Antioch
- ›Pre-approved ADU plans are reviewed within 30 days with reduced plan check fees
- ›The city posts a list of ADU designers with pre-approved plans
- ›Converted existing structures need no additional setback
Zoning
Allowed ADU Types
State law requires cities to allow, on a single-family lot, one ADU converted from existing space, one JADU, and one new detached ADU of up to 800 sq ft. Multifamily lots can add up to 8 detached ADUs (not more than the number of existing units) plus conversions of non-livable space for up to 25% of existing units.
ADUs and JADUs permitted by right on all residentially zoned lots. Antioch is an East Bay inland city that has expanded transit access through the eBART extension, increasing its appeal as an affordable Bay Area alternative. State law preempts owner-occupancy requirements.
Source: City of Antioch: Accessory Dwelling Units · Antioch Municipal Code Section 9-5.3805
Dimensions
Size & Setback Requirements
Detached
1,200
sq ft max
JADU
500
sq ft max
Attached
50% of primary home, max 1,200 sq ft
Setbacks
front
Same as primary dwelling per underlying zone
side
4 ft
rear
4 ft
Max height: 16 ft (detached); up to 25 ft if attached
State law floor for detached ADUs: 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building.
Lot coverage: Per underlying zone
Antioch's mix of older and newer residential neighborhoods provides a range of ADU opportunities. Newer east Antioch subdivisions have larger lots while older west Antioch neighborhoods feature smaller lots more suited for garage conversions or attached ADUs.
Permitting
Permit Process
Department
City of Antioch: Planning and Community Development Department
Review Timeline
60 days
Permit Fees
$7,000 – $13,000
Impact Fees
Impact fees waived for ADUs under 750 sq ft; prorated for larger units
Required Documents
- ›Site plan with property dimensions and setbacks
- ›Floor plans
- ›Elevations
- ›Title 24 energy compliance report
- ›Structural drawings
- ›Grading and drainage plan (if applicable)
Antioch processes ADU permits within state-mandated timelines. The eBART extension to Antioch (Pittsburg/Bay Point and beyond) has made the city more transit-accessible, driving interest from Bay Area workers seeking affordable housing options. Permit fees reflect Contra Costa County staffing costs.
Infrastructure
Utilities & Requirements
Solar
Required
Parking
Usually none
Separate Meter
Optional
Fire Sprinklers
Only if main home has them
Financials
ADU Costs in Antioch
Typical Build Cost
$150,000 – $305,000
Cost per Sq Ft
$210 – $275
Monthly Rental
$1,500 – $2,300/mo/mo
Property Value Added
Adds $115,000 – $210,000 to property value
Grants & Programs to Check
- ★CalHFA ADU Grant Program (closed since December 2023; watch calhfa.ca.gov for any new funding round)
- ★Contra Costa County housing programs may be available
The eBART extension has made Antioch a more viable Bay Area bedroom community, boosting ADU rental demand. As one of the more affordable East Bay cities, Antioch attracts renters priced out of Oakland, Walnut Creek, and Concord. ADU returns are favorable relative to construction costs.
Use the free ADU Cost Calculator →Free Service
Get Contractor Quotes in Antioch
Connect with licensed local ADU contractors. Takes 2 minutes, no obligation.
State Law
California Rules That Apply in Antioch
Antioch can be more generous than state law but not stricter. These statewide minimums were last reviewed September 30, 2026.
- Units per lot
- Single-family lots can have one ADU converted from existing space, one JADU, and one new detached ADU (up to 800 sq ft). Multifamily lots can add up to 8 detached ADUs (never more than the number of existing units) plus conversions for up to 25% of existing units. Gov. Code §66323; SB 1211 (2024)
- Size
- Cities must allow at least an 800 sq ft ADU with 4 ft side and rear setbacks. Local maximums can be no lower than 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). JADUs are capped at 500 sq ft of interior livable space. Gov. Code §§66321, 66333
- Height
- Detached ADUs: at least 16 ft; 18 ft within half a mile of major transit (plus 2 ft to match the roof pitch of the main home) or on a lot with a multistory multifamily building. Attached ADUs: 25 ft or the zone height limit, whichever is lower. Gov. Code §66321(b)(4); AB 2221 and SB 897 (2022)
- Setbacks
- Side and rear setbacks for new ADUs can be no more than 4 ft. Conversions of existing legal structures need no extra setback. Front setbacks cannot block an 800 sq ft ADU. Gov. Code §66314(d)(7); AB 2221 (2022)
- Permit timeline
- The city has 15 business days to say whether an application is complete, or it is deemed complete. It must then approve or deny a complete application within 60 days, with no public hearing. Gov. Code §66317; SB 543 (2025)
- Impact fees
- No impact fees on ADUs under 750 sq ft; larger units pay fees proportional to the main home. ADUs and JADUs of 500 sq ft or less are exempt from school impact fees. Gov. Code §66324; SB 543 (2025)
- Owner-occupancy
- Cities cannot require the owner to live on site for an ADU. For a JADU, owner-occupancy can be required only if the JADU shares a bathroom with the main home. JADUs cannot be short-term rentals. AB 976 (2023); AB 1154 (2025)
- Parking
- No parking is required for an ADU within half a mile walk of public transit, in a historic district, or for a conversion, and garage parking lost to an ADU does not have to be replaced. Gov. Code §66322
- Fire sprinklers
- Sprinklers cannot be required in an ADU unless the main home is required to have them. Gov. Code §66314(d)(12)
- Pre-approved plans
- Every city must offer a program for pre-approved detached ADU plans, and plans matching a pre-approved design must be approved or denied within 30 days. AB 1332 (2023); Gov. Code §65852.27
- Selling an ADU
- Cities may choose to let owners sell an ADU separately as a condominium. It is a local opt-in, so check whether your city has adopted it. AB 1033 (2023)
- Unpermitted ADUs
- ADUs built without permits before 2020 can be legalized. Cities cannot deny them for code violations unless the unit is a health and safety hazard, and fees are limited. AB 2533 (2024)
Sources
- City of Antioch: Accessory Dwelling Units (Antioch Municipal Code Section 9-5.3805)
- City of Antioch: Pre-Approved ADUs
- City of Antioch: How to Apply for an Accessory Dwelling Unit
- City of Antioch Accessory Dwelling Units handout
- Antioch Municipal Code § 9-5.3805 Accessory Dwelling Units
- California HCD Accessory Dwelling Unit Handbook
Compiled by the ADUByCity Team. How we verify city data.
Explore More
Nearby Cities in Contra Costa County
Antioch Quick Facts
- Max size1,200 sq ft
- Rear setback4 ft
- Permit timeline60 days
- Build cost$150,000 – $305,000
- Rental income$1,500 – $2,300/mo/mo
- Owner occupancyNot required
Official Source
City of Antioch: Accessory Dwelling UnitsAntioch Municipal Code Section 9-5.3805
Last verified: September 30, 2026
Stay Updated
ADU rules change often.
Get notified when Antioch's regulations update, plus guides on permitting and financing.